Engineering, Maintenance & Electricity
| Programs | Place | From | To | Duration | Registration |
Quality Control and Analysis in Electric Power Systems |
Kuala Lumpur | 0000-00-00 | 2010-07-01 | Five Days | Register |
Risks of Electric Installions |
Cairo | 2010-01-03 | 2010-01-07 | Five Days | Register |
Examine the Efficiency of Electrical Equipment in Power Stations |
Amman | 2010-01-03 | 2010-01-07 | Five Days | Register |
Heat Exchange and Cooling Towers |
Amman | 2010-01-10 | 2010-01-14 | Five Days | Register |
Wi Max |
Amman | 2010-01-17 | 2010-01-21 | Five Days | Register |
Rotary Devices - Operating, Maintenance, Vibration Analysis |
Amman | 2010-01-24 | 2010-01-28 | Five Days | Register |
Electrical Equipment and Control Systems Commissioning Testing and StartUp of Electrical Systems |
Amman | 2010-02-14 | 2010-02-18 | Five Days | Register |
Advanced Technology of Maintenance Works |
Dubai | 2010-02-21 | 2010-02-25 | Five Days | Register |
Rotating Equipment - Operation ,Maintenance ,Vibration Analysis |
Amman | 2010-02-28 | 2010-03-04 | Five Days | Register |
Operation and Maintenance of Electric Networks |
Cairo | 2010-02-28 | 2010-03-04 | Five Days | Register |
Design of Electric Distribution Networks |
Amman | 2010-02-28 | 2010-03-04 | Five Days | Register |
Heat Exchangers and Cooling Towers |
Amman | 2010-02-28 | 2010-03-04 | Five Days | Register |
Maintenance of Pipe Network and Pumps |
kualalampur | 2010-02-28 | 2010-03-04 | Five Days | Register |
Analysis of Machines Breakdown |
Amman | 2010-02-28 | 2010-03-04 | Five Days | Register |
Basic Tests and Control of Oil Wells |
Amman | 2010-02-28 | 2010-02-04 | Five Days | Register |
Check Codes |
Amman | 2010-02-28 | 2010-03-04 | Five Days | Register |
Lifting and Rigging Equipment Inspection, Testing |
Amman | 2010-02-28 | 2010-03-04 | Five Days | Register |
Data Analysis Techniques for Engineers & Technologists |
Amman | 2010-02-28 | 2010-03-04 | Five Days | Register |
Techniques of Multi_Projects Management |
Amman | 2010-03-07 | 2010-03-11 | Five Days | Register |
Industrial Wireless Communications |
cairo | 2010-03-07 | 2010-03-11 | Five Days | Register |
Test and Examination of Drilling Equipment and Lifting |
Bierut | 2010-03-14 | 2010-03-18 | Five Days | Register |
Data Analysis Techniques for Engineers & Technologists |
Bierut | 2010-03-14 | 2010-03-18 | Five Days | Register |
Value Engineering and its Applications in Operation and Maintenance |
Cairo | 2010-03-21 | 2010-03-25 | Five Days | Register |
GEAR |
Amman | 2010-03-21 | 2010-03-25 | Five Days | Register |
Repair Cycle Gas Turbines |
Amman | 2010-03-21 | 2010-03-25 | Five Days | Register |
Test and Examination of Drilling Equipment and Lifting |
Istnbul | 2010-03-21 | 2010-03-25 | Five Days | Register |
Centrifugal Compressor and Steam Turbine - Design Operations Maintenance |
Amman | 2010-03-21 | 2010-03-25 | Five Days | Register |
Air Conditioning Systems |
Aِmman | 2010-03-28 | 2010-04-01 | Five Days | Register |
Modern Maintenance Technologies Challenging Traditional Approaches in Maintenance |
Istnbul | 2010-04-04 | 2010-04-08 | Five Days | Register |
Advanced Technology of Maintenance Works |
Amman | 2010-04-11 | 2010-04-15 | Five Days | Register |
The Design and Operation and Maintenance of Valves |
Amman | 2010-04-11 | 2010-04-22 | Two weeks | Register |
Technical Training Program on the Machines : Panorama - Radiology - Almovoraz |
Amman | 2010-04-11 | 2010-04-29 | Three Weeks | Register |
Hidorelik Water and Concrete of Modern |
Amman | 2010-04-18 | 2010-04-29 | Two Weeks | Register |
Electric Power Distribution Systems |
Amman | 2010-04-18 | 2010-04-22 | Five Days | Register |
The Best Decisions for Maintenance or Replacement of Equipment |
Amman | 2010-04-18 | 2010-04-22 | Five Days | Register |
Industrial Wireless Communications |
Amman | 2010-04-18 | 2010-04-22 | Five Days | Register |
Advanced Technology of Maintenance Works |
Cairo | 2010-04-18 | 2010-04-22 | Five Days | Register |
Practical Pump and Valve Technology |
Cairo | 2010-04-18 | 2010-04-22 | Five Days | Register |
Operation and Maintenance of Electric Networks |
Amman | 2010-04-25 | 2010-04-29 | Five Days | Register |
Technology of Applied Consumption |
Amman | 2010-04-25 | 2010-04-29 | Five Days | Register |
Check Codes |
Amman | 2010-04-25 | 2010-04-29 | Five Days | Register |
Optimizing Equipment Maintenance and Replacement Decisions |
Bierut | 2010-04-25 | 2010-04-29 | Five Days | Register |
Maintenance and Operations Professional |
Amman | 2010-04-25 | 2010-04-29 | Five Days | Register |
Buildings and Utilities Maintenance Systems |
Cairo | 2010-05-02 | 2010-05-06 | Five Days | Register |
Maintenance Contracting & Outsourcing |
Istnbul | 2010-05-02 | 2010-05-06 | Five Days | Register |
Primavera |
Amman | 2010-05-02 | 2010-05-08 | Seven Days | Register |
Heat Exchange and Cooling Towers |
Cairo | 2010-05-02 | 2010-05-06 | Five Days | Register |
AutoCAD |
Istanbul | 2010-05-09 | 2010-05-18 | Ten Days | Register |
Electrical Installations and Maintenance |
Amman | 2010-05-09 | 2010-05-13 | Five Days | Register |
Project Pricing and Cost Control |
Amman | 2010-05-16 | 2010-05-20 | Five Days | Register |
Balancing the Rotor |
Amman | 2010-05-16 | 2010-05-20 | Five Days | Register |
Centrifugal Compressor and Steam Turbine Design Operations Maintenance |
Bierut | 2010-05-16 | 2010-05-20 | Five Days | Register |
Earthing and Protection Systems |
Amman | 2010-05-16 | 2010-05-20 | Five Days | Register |
Predective Maintenance |
Amman | 2010-05-23 | 2010-05-27 | Five Days | Register |
Fiber Optics Communication Networks |
Cairo | 2010-05-23 | 2010-05-27 | Five Days | Register |
Machinery Vibration and Condition Monitoring for Non-Vibration Engineering |
Amman | 2010-05-23 | 2010-05-27 | Five Days | Register |
Maintenance of Equipments:Reliability Best Practices, Contracting & Outsourcing |
Bierut | 2010-05-23 | 2010-05-27 | Five Days | Register |
Analysis of Service and Electric Networks Breakdown |
Cairo | 2010-05-30 | 2010-06-03 | Five Days | Register |
Machinery Vibration and Condition Monitoring for Non-Vibration Engineering |
Bierut | 2010-05-30 | 2010-06-03 | Five Days | Register |
Electrical Installations in Hazardous Areas Classification Safe Handling Operation and Maintenance |
Beirut | 2010-05-30 | 2010-06-03 | Five Days | Register |
Petrochemical and Process Plants |
Amman | 2010-05-30 | 2010-06-03 | Five Days | Register |
Design of Electric Distribution Networks |
Amman | 2010-05-30 | 2010-06-03 | Five Days | Register |
Maintenance of Pipe Network and Pumps |
Cairo | 2010-06-06 | 2010-06-10 | Five Days | Register |
Hot Parts Inspection & Testing |
Amman | 2010-06-06 | 2010-06-10 | Five Days | Register |
Practical Process Instrumentation & Automatic Control |
Amman | 2010-06-06 | 2010-06-10 | Five Days | Register |
Maintenance Contracting & Outsourcing |
Amman | 2010-06-06 | 2010-06-10 | Five Days | Register |
Data Analysis Techniques for Engineers & Technologists |
Istnbul | 2010-06-06 | 2010-06-10 | Five Days | Register |
MS Project |
Cairo | 2010-06-06 | 2010-06-12 | Seven Days | Register |
Examine the Efficiency of Electrical Equipment in Power Stations |
Amman | 2010-06-06 | 2010-06-10 | Five Days | Register |
Operation and Maintenance of Electric Power Plants |
Amman | 2010-06-13 | 2010-06-17 | Five Days | Register |
Security of Electric Generation Plants |
Cairo | 2010-06-13 | 2010-06-17 | Five Days | Register |
Hydraulic Systems |
Amman | 2010-06-13 | 2010-06-17 | Five Days | Register |
Process Equipment and Piping Systems Failures, Failure Prevention & Repairs |
Amman | 2010-06-13 | 2010-06-17 | Five Days | Register |
Reciprocating Compressors |
Kuala Lumpur | 2010-06-13 | 2010-06-17 | Five Days | Register |
Basics of Total Productivity Maintenance |
Ammna | 2010-06-20 | 2010-06-24 | Five Days | Register |
Mechanical Seals Designs, Application, Selection, Installation, Troubleshooting and Maintenance |
Istnbul | 2010-06-20 | 2010-06-24 | Five Days | Register |
Operation and Maintenance of Electric Networks |
Amman | 2010-06-20 | 2010-06-24 | Five Days | Register |
3D MAX |
Istanbul | 2010-06-20 | 2010-07-03 | Fourteen Days | Register |
Modern Electrical Power Systems |
Amman | 2010-06-20 | 2010-06-24 | Five Days | Register |
Fundamentals of Mechanical Technology |
Dubai | 2010-06-20 | 2010-06-24 | Five Days | Register |
Maintenance Contracting & Outsourcing |
Beirut | 2010-06-20 | 2010-06-24 | Five Days | Register |
Maintenance Contracting & Outsourcing |
Bierut | 2010-06-27 | 2010-07-01 | Five Days | Register |
Machinery Vibration and Condition Monitoring for Non Vibration Engineering, Maintenance and Operations Professionals |
Amman | 2010-06-27 | 2010-07-01 | Five Days | Register |
Fundamentals of Process Technology |
Kuala Lumpur | 2010-06-27 | 2010-07-01 | Five Days | Register |
Heat Exchangers: Types and Application, Design, Operation and Maintenance |
Damascus | 2010-06-27 | 2010-07-01 | Five Days | Register |
Buildings and Utilities Maintenance Systems |
Amman | 2010-07-04 | 2010-07-08 | Five Days | Register |
Development of Administrative Skills of Middle Management |
Cairo | 2010-07-04 | 2010-07-08 | Five Days | Register |
Productivity and Quality Improvement |
Amman | 2010-07-04 | 2010-07-08 | Five Days | Register |
Machinery Vibration and Condition Monitoring for Non-Vibration Engineering |
Istnbul | 2010-07-04 | 2010-07-08 | Five Days | Register |
Decision Analysis for Operation and Maintenance Professionals |
Amman | 2010-07-04 | 2010-07-08 | Five Days | Register |
Electrical Distribution Systems, Operation and Maintenance |
Amman | 2010-07-04 | 2010-07-08 | Five Days | Register |
Electronic Maintenance |
Cairo | 2010-07-04 | 2010-07-10 | Seven Days | Register |
Maintenance and Reliability Best Practices:Lowering Life Cycle Cost of Equipment |
Beirut | 2010-07-04 | 2010-07-08 | Five Dyas | Register |
Vibrations Measurement of Rotating Machines |
Amman | 2010-07-11 | 2010-07-15 | Five Days | Register |
MatLab |
Bierut | 2010-07-11 | 2010-07-17 | Seven Days | Register |
Modern Systems of Electrical Maintenance |
Kuala Lumpur | 2010-07-11 | 2010-07-15 | Five Days | Register |
Risks of Electrical Installations |
Damascas | 2010-07-11 | 2010-07-15 | Five Days | Register |
Maintenance and Reliability Best Practices:Lowering Life Cycle Cost of Equipment |
Cairo | 2010-07-11 | 2010-07-15 | Five Days | Register |
Practical Pump Technology |
ِAmman | 2010-07-18 | 2010-07-22 | Five Days | Register |
Inspection, Evaluation and Repair of Process Plant Equipment and Connected Piping |
Kuala Lumpur | 2010-07-18 | 2010-07-22 | Five Days | Register |
Practical Failure Analysis |
Cairo | 2010-07-18 | 2010-07-22 | Five Days | Register |
Maintenance and Operations Professional |
Bierut | 2010-07-25 | 2010-07-29 | Five Days | Register |
Maintenance and Reliability Best Practices:Lowering Life Cycle Cost of Equipment |
Bierut | 2010-07-25 | 2010-07-29 | Five Days | Register |
Electrical Distribution Equipment Operation and Maintenance |
Istnbul | 2010-07-25 | 2010-07-29 | Five Days | Register |
Value Engineering |
Istnbul | 2010-07-25 | 2010-07-29 | Five Days | Register |
Fault Analysis in Service Networks and Electric Industrial Networks |
Dubai | 2010-07-25 | 2010-07-29 | Five Days | Register |
Managing Safe Isolation of Process Equipment (Lockout & Tagout) |
Kuala Lumpur | 2010-08-01 | 2010-08-05 | Five Days | Register |
Understanding the Codes: ASME Boiler & Pressure Vessel Code, and B31 Pressure Piping Codes |
Beirut | 2010-08-01 | 2010-08-05 | Five Days | Register |
Electrical Faults: Causes, Analysis, Detection & Remedies |
Cairo | 2010-08-01 | 2010-08-05 | Five Days | Register |
Maintenance and Reliability Best Practices:Lowering Life Cycle Cost of Equipment |
Kuala Lumpur | 2010-08-01 | 2010-08-05 | Five Days | Register |
Maintenance of Equipments:Reliability Best Practices, Contracting & Outsourcing |
Amman | 2010-08-08 | 2010-08-12 | Five Days | Register |
Electrical Equipment and Control Systems Commissioning Testing and StartUp of Electrical Systems |
Istanbul | 2010-08-08 | 2010-08-12 | Five Days | Register |
Technology of Applied Consumption |
ِAmman | 2010-08-15 | 2010-08-19 | Five Days | Register |
Disrtibution System Planning In Electrical Network |
Amman | 2010-08-15 | 2010-08-19 | Five Days | Register |
Electric Network Design |
Amman | 2010-08-15 | 2010-08-19 | Six Days | Register |
High Pressure Electric Circuits Switches |
Amman | 2010-08-22 | 2010-08-26 | Five Days | Register |
Maintenance and Operations Professional |
Istnbul | 2010-08-22 | 2010-08-26 | Five Days | Register |
Transformer Operational Principles Selection and Troubleshooting |
Amman | 2010-08-22 | 2010-08-26 | Five Days | Register |
Protection and Organization of Electric Networks |
Amman | 2010-08-29 | 2010-09-02 | Five Days | Register |
Technical Project Management |
Istnbul | 2010-08-29 | 2010-09-02 | Five Days | Register |
Root Cause Failure Analysis |
Bierut | 2010-08-29 | 2010-09-02 | Five Days | Register |
Electrical Distribution Equipment Operation and Maintenance |
Amman | 2010-08-29 | 2010-09-02 | Five Days | Register |
Advanced Techniques and Skills of Project Management |
Amman | 2010-09-05 | 2010-09-09 | Five Days | Register |
Workshop Maintenance and Planning |
Bierut | 2010-09-05 | 2010-09-09 | Five Days | Register |
Inspection and Testing of Hot Parts |
Amman | 2010-09-12 | 2010-09-16 | Five Days | Register |
AC Electrical Motors & Drives: Troubleshooting, Maintenance & Protection |
Istanbul | 2010-09-12 | 2010-09-16 | Five Days | Register |
Risk Reliability Management |
Amman | 2010-09-12 | 2010-09-16 | Five Days | Register |
GEAR |
Amman | 2010-09-19 | 2010-09-23 | Five Days | Register |
Educational Aovrholat Gas |
Amman | 2010-09-19 | 2010-09-23 | Five Days | Register |
Hydraulic Systems |
Amman | 2010-09-19 | 2010-09-23 | Five Days | Register |
Transformer Operational Principles Selection and Troubleshooting |
Beirut | 2010-09-19 | 2010-09-23 | Five Days | Register |
Building General Maintenance ,Control and Inspection |
Amman | 2010-09-26 | 2010-09-03 | Five Days | Register |
Balancing the Rotor |
Amman | 2010-09-26 | 2010-09-30 | Five Days | Register |
Practical Valve Technology Selection, Operation, Maintenance and Troubleshooting |
Bierut | 2010-09-26 | 2010-09-30 | Five Days | Register |
Practical Pump Technology |
Bierut | 2010-09-26 | 2010-09-30 | Five Days | Register |
Supervision Concrete Construction |
Dubai | 2010-09-26 | 2010-09-30 | Five Days | Register |
Design of Electric Distribution Network |
Amman | 2010-10-03 | 2010-10-07 | Five Days | Register |
Practical Valve Technology Selection, Operation, Maintenance and Troubleshooting |
Amman | 2010-10-03 | 2010-10-07 | Five Days | Register |
Process Plant Troubleshooting Engineering Problem Solving |
Amman | 2010-10-03 | 2010-10-07 | Five Days | Register |
The Design and Operation and Maintenance of Valves |
Amman | 2010-10-10 | 2010-10-23 | Two Weeks | Register |
Risks of Electric Installations |
Amman | 2010-10-10 | 2010-10-14 | Five Days | Register |
Heat Exchsnge and Cooling Towers |
Amman | 2010-10-10 | 2010-10-14 | Five Days | Register |
Project Management Technology |
Amman | 2010-10-10 | 2010-10-14 | Five Days | Register |
Economic & Technical Evaluations in Engineering & Maintenance Projects |
Bierut | 2010-10-10 | 2010-10-14 | Five Days | Register |
Improvement of Electric Power Ability |
Amman | 2010-10-16 | 2010-10-20 | Five Days | Register |
Electrical Installations in Hazardous Areas Classification Safe Handling Operation and Maintenance |
Amman | 2010-10-16 | 2010-10-20 | Five Days | Register |
Electric and Electronic Measurement Equipment |
Amman | 2010-10-17 | 2010-10-21 | Five Days | Register |
Analysis of Machines Breakdown |
Amman | 2010-10-17 | 2010-10-21 | Five Days | Register |
Control Processes and Defect Repair |
Cairo | 2010-10-17 | 2010-10-21 | Five Days | Register |
Modern Hidorelika of Water and Concrete |
Amman | 2010-10-17 | 2010-10-28 | Two Weeks | Register |
Building Maintenance & Cuntroler |
Amman | 2010-10-23 | 2010-10-29 | Seven Days | Register |
Electric Protection |
Amman | 2010-10-24 | 2010-10-28 | Five Days | Register |
Technical Project Management |
Amman | 2010-10-24 | 2010-10-28 | Five Days | Register |
Materials of Construction for Process Equipment and Piping Systems- |
Amman | 2010-10-24 | 2010-10-28 | Five Days | Register |
Root Cause Failure Analysis |
Amman | 2010-10-24 | 2010-10-28 | Five Days | Register |
Modern Electrical Power Systems |
Amman | 2010-10-24 | 2010-10-28 | Five Days | Register |
Planning of Distribution Systems for Electricity Grids |
Amman | 2010-10-31 | 2010-11-04 | Five Days | Register |
Contracts and Insurance Rules and Dispute Settlement by Arbiteration |
Tunaisi | 2010-10-31 | 2010-11-04 | Five Days | Register |
Protection and Organization of Electtric Networks |
Amman | 2010-10-31 | 2010-11-04 | Five Days | Register |
Risks of Electric Installations |
Amman | 2010-10-31 | 2010-11-04 | Five Days | Register |
Electrical Installations and Maintenance |
Amman | 2010-10-31 | 2010-11-04 | Five Days | Register |
The Workshop for the Maintenance and Planning |
Amman | 2010-11-07 | 2010-11-11 | Five Days | Register |
Safety Engineering and Risk Management |
Istanbul | 2010-11-07 | 2010-11-11 | Five Days | Register |
Decision Analysis for Operation and Maintenance Professionals |
Cairo | 2010-11-07 | 2010-11-11 | Five Days | Register |
Decision Analysis for Operation and Maintenance Professionals |
Kuala lumpur | 2010-11-14 | 2010-11-18 | Five Days | Register |
Practical Pump and Valve Technology |
Amman | 2010-11-14 | 2010-11-18 | Five Days | Register |
Internal Maintenance Auditing |
Damascus | 2010-11-14 | 2010-11-18 | Five Days | Register |
Maintenance & Inspection |
Amman | 2010-11-21 | 2010-11-25 | Five Days | Register |
Maintenance Management & Technology - A to Z of Best Practices ™ |
Dubai | 2010-11-21 | 2010-11-25 | Five Days | Register |
Safe Work Practices for Confined Space Entry |
Damascus | 2010-11-21 | 2010-11-25 | Five Days | Register |
Risk-Based Inspection in Maintenance |
Istanbul | 2010-11-28 | 2010-12-02 | Five Days | Register |
Advanced Vibration Analysis |
Amman | 2010-11-28 | 2010-12-02 | Five Days | Register |
Safe Operation & Maintenance of Circuit Breakers and Switchgears |
Cairo | 2010-11-28 | 2010-12-02 | Five Days | Register |
Integrated Skills of Project Management |
Amman | 2010-12-05 | 2010-12-09 | Five Days | Register |
Advanced Project Planning and Control |
Kuala Lumpur | 2010-12-05 | 2010-12-09 | Five Days | Register |
Maintenance Management Best Practices: Systems, Tools & Techniques |
Beirut | 2010-12-05 | 2010-12-09 | Five Days | Register |
Mechanical Seals Designs, Application, Selection, Installation, Troubleshooting and Maintenance |
Amman | 2010-12-12 | 2010-12-16 | Five Days | Register |
Pumps and Pipe Networks Maintenance |
Dubai | 2010-12-12 | 2010-12-16 | Five Days | Register |
Advanced Corrosion Technology |
Beirut | 2010-12-12 | 2010-12-16 | Five Days | Register |
Modern Systems of Electric Power |
Cairo | 2010-12-19 | 2010-12-23 | Five Days | Register |
Legal and Administrative Skills of Administrative Skills of Adminstrative Investigations |
Kuala Lumpur | 2010-12-19 | 2010-12-23 | Five Days | Register |
Functional Description and Settings of Turbine Governor |
Amman | 2010-12-19 | 2010-12-23 | Five Days | Register |
Technical Applications for Alectric Power Consumption |
Amman | 2010-12-26 | 2010-12-30 | Five Days | Register |
Materials of Construction for Process Equipment and Piping Systems- |
Istnbul | 2010-12-26 | 2010-12-30 | Five Days | Register |
Networks of Modern Electric Power |
Beirut | 2010-12-26 | 2010-12-30 | Five Days | Register |
Speed and Vibrations Measurement System |
Dubai | 2010-12-26 | 2010-12-30 | Five Days | Register |